ADR-0810: ADR-0108 Six-Deliverables Compliance Audit (2026-05-29) + D3 Gap Fixes

  • Status: Accepted
  • Date: 2026-05-29
  • Deciders: lusoris
  • Tags: docs, agents, process

Context

ADR-0108 mandates that every fork-local PR ships six deliverables: (1) research digest, (2) decision matrix in the ADR's ## Alternatives considered, (3) an AGENTS.md invariant note, (4) a reproducer/smoke-test command in the PR body, (5) a changelog.d/ fragment, and (6) a docs/rebase-notes.md entry.

A compliance audit run on 2026-05-29 covering the five most recently merged PRs (#1573, #1568, #1582, #1583, #1571, all merged 2026-05-28) found a 93 % pass rate (28/30 deliverables present). The sole recurring gap was deliverable D3: two PRs (#1583 and #1571) did not register their rebase-sensitive invariants in AGENTS.md even though the relevant notes existed in docs/rebase-notes.md.

This ADR documents both the audit findings and the D3 remediation applied in the same PR.

Decision

We accept the audit findings as a point-in-time baseline. The two D3 gaps are fixed immediately:

  1. Root AGENTS.md §13 receives a new invariant row for the libvmaf/ → core/ rename (PR #1571, ADR-0700) and a new row for the vmafx-server [http] optional dependency group (PR #1583, ADR-0701).
  2. mcp-server/AGENTS.md receives an HTTP transport dispatch-order invariant note.
  3. Two stale libvmaf/AGENTS.md path references in root §13 are corrected to core/AGENTS.md.

A process fix is also recorded: the PR template checklist item for D3 should require the author to choose one of two branches — a filled invariant note or an explicit opt-out sentinel with a reason. Prose-only opt-outs in the PR body are insufficient for automated auditing.

Alternatives considered

Option Pros Cons Why not chosen
Fix D3 gaps retroactively on the merged commits Source of truth is the commit Rewriting merged history violates branch-protection Rejected — apply fixes as a follow-up commit on a new branch, which is the standard pattern
Require re-opening and re-merging the two non-compliant PRs Formally correct Extremely disruptive; both PRs are stable and the gap is documentation-only Rejected — proportional response is a follow-up fix PR
Defer D3 fixes to the next PR touching those files Zero extra PR Gap persists in AGENTS.md for an unknown duration, visible to all agents Rejected — D3 gap is actionable today at near-zero cost

Consequences

  • Root AGENTS.md §13 and mcp-server/AGENTS.md are now accurate for the two 2026-05-28 deliverables.
  • The audit research digest (docs/research/adr-0108-compliance-audit-2026-05-29.md) provides a snapshot baseline for future automated compliance scripts.
  • The recurring D3 failure pattern is named: "rebase-notes substitute without AGENTS.md index row" — future audits can grep for this pattern.

References

  • req: "Sample 5 recently-merged PRs from the last 24h and verify the ADR-0108 six deliverables are present + cited correctly."
  • ADR-0108: docs/adr/0108-deep-dive-deliverables-rule.md
  • ADR-0700: docs/adr/0700-vmafx-repo-layout.md (PR #1571 — D3 gap)
  • ADR-0701: docs/adr/0701-vmafx-cloud-native-redesign.md (PR #1583 — D3 gap)
  • Audit report: docs/research/adr-0108-compliance-audit-2026-05-29.md